  1. 1£®Conditions allow, the north of the engine room should normally be selected as wind in holes, the south side of the engine room as wind out. Wind in holes should be a meter from the ground; wind out 0.5 meter from the ceiling, 50cm below the hole should have no such equipment as battery. Location is chosen, the use hole openings template to draw on the wall of the main machine, the subsidiary machine, and two Waterproof covers and the screw hole location, and location to the painting should be level.
  2. 2£®Open wind hole and install screw hole£»
  3. 3£®Fix waterproof cover£»
  4. 4£®Fix main machine and subsidiary machine£»
  5. 5£®Fix Indoor temperature and humidity sensor box, the outdoor temperature probe£»
  6. 6£®Fix Plastic trunkings£»
  7. 7£®Fix Contactors and air switch£»
  8. 8£®Link wire£»
  9. 9£®DC Power Connector (if assigned inverter).